Installation Steps of The Picket Railing Concrete Floor

Steps of The Picket Railing Concrete Floor
INSTALLATION STEPS OF THE PICKET RAILING (CONCRETE FLOOR)
  1. Take posts
  2. Take spindles
  3. Measure 2 ¾” from the top post and place top spindle.
  4. Screw the spindles to the post
  5. Screw the panel to the spindles
  6. Mark the holes on concrete slab
  7. Drill the holes on concrete slab
  8. Hammer the Anchor Bolts/Plugs in the holes
  9. Place panel/post assembly on the ground
  10. Place the bolts on top and tighten
  11. Place plastic covers on aluminum base
  12. Place Caps on the posts
  13. Place snaps on the top handrail and bottom channel.
  14. Always follow Ontario Building Code Requirements (height of handrail and bottom gap