INSTALLATION STEPS OF THE PICKET RAILING (WOOD FLOOR)
- Take posts
- Take spindles
- Measure 2 ¾” from the top post and place top spindle.
- Screw the spindles to the post
- Screw the panel to the spindles
- Mark the holes on the deck
- Drill the holes on the deck
- Place panel/post assembly on the ground
- Screw in the wood deck the assembly with Lag Screws stainless steel 410 SS/304SS
- Place plastic covers on aluminum base
- Place Caps on the posts
- Place snaps on the top handrail and bottom channel.
- Always follow Ontario Building Code Requirements (height of handrail and bottom gap)